Revisting the AMT Refit Enterprise part 1 by Don Matthys

Stripping the paint from the primary hull.

refitrevisit1003

refitrevisit1004

Removing the upper decks level is accomplished by drilling a series of small holes going in sideways.

refitrevisit1005

 refitrevisit1007

This lets a small craft knife blade to rip through the holes. Now easy to pry up and away.

refitrevisit1008

 refitrevisit1009

Removed section is ready to accept the replacement casting a clear casting for lighting or gray resin with improved surface detail.

refitrevisit1010

refitrevisit1011

The clear upper decks casting will allow vision into the set detail from the Original Refit

on to page 2

Leave a Reply